Garage, patio and pool deck floors · Nationwide
Residential Concrete Coatings for Garages, Patios and Pool Decks
Garage, patio, pool deck, driveway or countertop, nationwide. In-house crews based in South Florida. Most floors are back in use in one to three days.
TRUSTED BY:
Which space
Which space is it?
Pick your space and you get what it has to take, what makes it different, and the page that covers it in full.

- What it takes
- Hot tires, oil, and a car parked on it.
- What makes it different
- A garage is a coating job from the slab up rather than a resurfacing job, so the prep goes down to bare concrete before anything is laid.
- Systems we put in a garage
If your space is not one of the five, ask on the call. Anything with a concrete slab under it can take one of the same systems, and it is priced the same way.
What you actually get
One to three days, and then years
We grind the slab, patch what needs patching, lay the system and seal it. Then we come off your driveway and you get a sheet telling you how to keep it.
Maintenance
The finished surface is non-porous. Upkeep is a mop, or a light pressure wash on outdoor work.
The limit
A coating is only as good as the slab under it. If the slab tests wet, we say so before we quote. We tell you what it costs to fix rather than coating over it.

How long it takes
- Days on site
- Garage 2 to 3 days, patio 2 to 3, pool deck 3 to 4, driveway 2 to 4, countertop 1 to 3.
- Back on the floor
- Polished concrete: same day. Coatings: hours to days before foot traffic, longer before full service.
Price
What a home floor costs
Every garage, patio or pool deck gets its own price. Four things set the number, and only one of them is the system you pick.
What moves the number
- The slabyou have
- The prepit needs
- The systemyou pick
- The size ofthe space
The finishes
Pick your floor
Four systems, ten collections. Start here.




Polymer flake
- Flake collection
- Cabin Fever
- Orbit
- Domino
- Shoreline
- Outback
- Stonehenge
Floors like these, in the buildings they went into, are in the project register.
How a home job runs
What actually happens at your house
Five stages, one crew, a written price and a date before we start.
Why this is not a weekend job
A standard DIY kit etches the concrete with acid instead of grinding it. The concrete underneath is never properly prepared, so the coating comes up in one to three years. Grinding it properly takes a machine over a thousand pounds. Plugging that into a socket in your house is an electrical problem, not a flooring one. That is the whole difference, and it is the reason our crews run the machines that do it properly.

You pick a system, then a collection, then a finish
Start with what the space has to take. A garage that holds a car and a pool deck that gets wet do not take the same system. Color and finish options are reviewed during the consultation.

We test the slab before anybody quotes
Moisture is what makes coatings fail, so it gets tested before anybody quotes a number.

You get a written price and a date
System, finish, prep, the days we are on site and the price, in writing, before we start.

We grind, lay and seal
Grinding with dust containment, then the base coat, then the broadcast, then the top coat.

We hand it back with a maintenance sheet
You get the sheet on the last day and it tells you what to use and what to keep off it.
Who does the work
Nationwide, with our own crews in South Florida
- In-house crews
- They routinely cover Miami-Dade, Broward and Palm Beach counties.
- Where we work
- Projects nationwide. Outside South Florida, how we deliver each one depends on its scope, location and mobilization.
- The equipment
- In South Florida, the crew brings its grinding and vacuum equipment, with dust containment, so the rest of your home keeps working while we grind.
- Backed by the manufacturer
- Most flooring contractors buy their systems from somebody else. Ours are made by Xtreme Polishing Systems, our sister company, and our crews are trained on the same equipment XPS supplies to installers nationwide.
Straight Answers
Most homes are done in one to three days on site. After the last coat the floor needs time before you walk on it, and longer before you park on it. You get both dates in writing before we start.
A home or garage floor is quoted from the measured area, the prep the slab needs and the system you pick. We measure the space and test the slab on site, so the written price comes after we see the floor and before any work starts.
You get one number to call and one person who answers for your job. The days we are on site are in the written price before we start. If the date moves, we let you know the same day.
Yes. We grind the slab, so it has to be bare. Cars, shelving, fridges and boxes all come out before day one. If a unit is plumbed in or too heavy to move, tell us when we walk the floor. We will work out who moves it. Nothing gets shifted without you knowing.
Direct sun ambers a clear epoxy top coat over time. Hot tires lift a coating that was never properly ground in, which is what happens to acid-etched kits. Both come down to prep and to the top coat. Tell us whether the floor is under a roof or in open sun and we will tell you what goes down.
No. Anything that is lifting comes off first, down to bare concrete. Taking old coatings off is part of our scope. We take off glue, mastic and thinset too. Coating over a failing floor buys you a year and then the same problem.
Tell us about the floor
Tell us the space and roughly how big it is.We come back with what it would cost and when we could start.
Prefer to talk? Call +1 844-876-5474
- Leads@
nationalconcretepolishing.net - 2200 NW 32nd St #600,
Pompano Beach, FL 33069 Mon to Fri, 9:00 to 5:30





